Manly Andrew ‘Boy’ Charlton Aquatic Centre

1 Kenneth Road, Manly, NSW


5,500sqm


2016


Manly Council


18 months

Download PDF

FDC have completed the construction of the Manly Andrew ‘Boy’ Charlton Aquatic Centre located at 1 Kenneth Road, Manly.

The project was delivered over 18 months and covered 5,500sqm which includes a 3,500sqm pool hall with a spa, leisure pool, program pool and 25m pool. In addition to this, a 2,000sqm multi-storey building which features an office space, gym facilities, amenities and crèche was built.

FDC completed this project in conjunction with Michael Davies Architecture.

Project Features

  • 3,500sm pool hall with a spa, leisure pool, program pool and 25m pool
  • 2,000sqm multi-storey building featuring an office space, gym facilities, amenities and crèche

 

Read more

 

Awards

2016Winner, MBA Best Sporting Facility

1 / 4