Project Description

The existing facility required critical plant upgrades to ensure end-of-life equipment did not impact the operation of the facility. It included the removal of historic single point failure.

A gradual replacement of the CRAC units was necessary whilst the data hall was operational and whilst managing the increased IT load required of the business. Upgrades were also necessary to generator controllers, fuel systems and switchboards within a live environment.

Project Features

  • Critical plant upgrades
  • Removal of historic single point failure
  • Replacement of CRAC units whilst data hall was operational
  • Upgrades to generator controllers, fuel systems and switchboards within a live environment

Program

5 months

Client

Vodafone