Project Description

A project built in two distinct stages, the facility spans some 20,000sqm. Built for Mirvac, the buildings each have a 400sqm office component.

Precast concrete dado and metal cladding forms the basic construction detail.

Features include sunken docks to both buildings and a substantial awning bridging both buildings, facilitating efficient side loading / unloading.

Project Features

  • Two stage construction
  • 400sqm office component
  • Precast concrete dado
  • Metal cladding
  • Sunken docks to both buildings
  • Substantial awning bridging both buildings

Project Size

20,000sqm

Client

Mirvac & Startrack Express

View Printable PDF