Posted .

FDC recently completed the fitout of CBRE’s head office located on levels 20 and 21, 363 George Street, Sydney.

The 2,500sqm project was delivered in collaboration with WMK Architecture in line with the 12 week program.

The project included the construction of an interconnecting staircase between the two levels, new front of house reception with timber floor and the construction of formal and informal meeting areas. The build also included a bar and large entertaining area incorporating operable walls that can be closed to form four meeting rooms.